California Community Colleges Proposition 1D Project Details
Project Name Utility Infrastructure Replacement/ Seismic Strengthening
CFIS 40.42.108
District REDWOODS COMMUNITY COLLEGE DISTRICT
College COLLEGE OF THE REDWOODS
City Eureka
County Humbolt
Senate District 2
Assembly District 2
Project Description and Status
Project Type Seismic
Date Funded 6/30/2014
Project Description This proposal represents the least cost solution to stabilizing the campus infrastructure to maintain the operations at the college in the event of an earthquake. The fire suppression and firefighting water systems, electrical distribution and communication systems, storm water systems, sanitary sewer, wastewater treatment and natural gas systems, mainly constructed in early 1960ís, are beyond their useful life and subject to recurring failures. In the event of an earthquake, these systems will fail. Water is stored in two 370,000-gallon redwood tanks that will collapse flooding the campus. Natural gas lines run through the major fault on campus.
Project Status In Preliminary Design
Project Schedule Detail
Scheduled Actual
Preliminary Planning Begins 8/1/2014 7/16/2014
Preliminary Planning Approved, Design Begins 3/1/2015 5/14/2015
Design Approved, Authorized to go to Bid 5/1/2016
Construction Begins 6/1/2016
Facility Enters Into Use 7/1/2018
Project Closeout
Project Budget Summary
State Financing $36,558,000
Local/Non-State Financing $0
Total Financing $36,558,000
State Contact Harold Flood
hflood@cccco.edu
District Contact Kathryn G. Smith
7074764170
Project Financing Detail
State Local Total
Acquisition $0 $0 $0
Preliminary Plans $2,063,000 $0 $2,063,000
Working Drawings $1,349,000 $0 $1,349,000
Construction $33,146,000 $0 $33,146,000
Equipment $0 $0 $0
Total Project Financing $36,558,000 $0 $36,558,000
Project Cost Detail
Initial Budget Variance Revised Budget
Acquisition $0 $0 $0
Preliminary Plans $2,063,000 $332 $2,062,668
Working Drawings $1,349,000 $287 $1,349,287
Construction $33,146,000 $0 $33,146,000
Contract $31,227,000 $0 $31,227,000
Allowances $1,919,000 $0 $1,919,000
Equipment $0 $0 $0
Total Project Financing $36,558,000 $45 $36,557,955